Agoric Proposal: #65
Upgrade to agoric-upgrade-13
Turnout:62.64%
Quorum:33.40%
Yes: 100%
321,332,727 BLD
No: 0%
578 BLD
No With Veto: 0%
0 BLD
Abstain: 0%
2,862 BLD
Voting Period
-Deposit End
Submit Time
Description
This proposal if voted will upgrade the chain to agoric-upgrade-13
Release details
Auto smart-wallet provisioning
-
This feature eliminates a known friction point for users; the need to provision a smart wallet before interacting with contracts on the Agoric chain, by charging for and provisioning a user’s smart wallet as part of their transaction cost on the first transaction they make with an Agoric contract. Specifically, it adds 1 IST to the charged fee during a wallet spend action (e.g., creating a vault on Inter protocol) where no existing smart wallet is detected against the user’s Agoric1 address. The amount is a parameter governed by BLD Stakers.
-
Switching the provision fee to IST also drives a longer term UX goal to ensure users can transact in system only with IST
Interchain stack
-
Agoric smart contracts will soon be able to seamlessly orchestrate activity cross-chain by connecting to the IBC module and managing Interchain Accounts
-
To prepare for this capability, the Agoric chain needs to make a series of incremental upgrades to get to ibc-go V7 by February 2024.
-
This upgrade contains a bump to ibc-go V4 on our pathway to that goal. It entails upgrading tendermint to cometbft 0.34.27, cosmos-sdk to 0.45.16 and ibc-go to 4.5.1
Discussion
https://community.agoric.com/t/discussion-period-agoric-upgrade-13/560
Release
https://github.com/Agoric/agoric-sdk/releases/tag/agoric-upgrade-13
Details of Upgrade Time
The proposal targets the upgrade proposal block to be 13017175, anticipated to be on Dec 21, 2023 1:00PM UTC.
Because blocks can occur at irregular intervals, please keep an eye on the Agoric chain for a precise upgrade time.